TSXV:PEM.P - Post by User
Comment by
ghost958on Jul 23, 2010 6:33pm
314 Views
Post# 17293452
RE: RE: RE: RE: PEM looking good
RE: RE: RE: RE: PEM looking good"
The Phase-Three drillprogram will consist ofapproximately 33 holes ranging in depth from 150meters (500 ft) to 610 meters(2,000 feet) for a total of 10,000 meters(33,000 feet) of drilling. It isdesigned to intersect the previouslyannounced “target” which may contain15,000,000 to 25,000,000 tonnes ofmineralized material grading from 0.7to 1.2g/t Au and may contain 337,000to964,000 ounces if intercepted by thedrilling."
0.7 TO 1.2g/t looks too low for the coming results. And the mineralizedsize keeps growing. Anyone compare the new cross section with 2009-10?
Ghost