RE: SesmicsFrom the June 30th NR:
A regional seismic contractor has been mobilized to acquire a minimum 300km 2D seismic survey. Due to favourable terrain conditions, only vibrator energy sources will be utilized. This program is scheduled to take approximately three months and is expected to be completed in September. Simultaneously to the seismic program, the Company is conducting a Surface Geological Study.
So siesmic started in June and will be finished soon. The July 15th NR did not mention seismic.