PINL:VLTAF - Post by User
Comment by
stayhumble1on Sep 22, 2010 9:50am
241 Views
Post# 17478083
RE: ***NEWS***
RE: ***NEWS***From the release:
The drilling program is aimed at achieving the following objectives (see Figure 2):
- Infill the core of the main deposit defined so far in the Central
Area to 25m x 50m drill spacing in order to raise the category of
most of the Indicated to Measured Resources and Inferred to Indicated
Resources.
- Extend the drilling depth of the main area of the deposit in the
Central Area so that the interval between 200 meters and 300 meters
below surface delivers Inferred Resources.
- Extend and infill the drilling north of the main deposit by
approximately 450 meters on 50m x 50m drill spacing in an attempt to
add additional Indicated and Inferred Resources.
- Additional drilling to the northwest of the main deposit in the
Central Area in order to follow up recent good intersections achieved
in the KHZ zone. This drilling will also attempt to add Indicated and
Inferred Resources.
- Extend and infill the drilling south of the main deposit by
approximately 400 meters on 50m x 50m drill spacing in an attempt to
add additional Indicated and Inferred Resources.