RE: RE: RE: Dream on!!!!SOC better be careful how they phrase their words as stated in the last PR. Notice the last sentence now I am surprised at any mining company who does drilling not needing infrastructure to start off with unless they are thinking of using CAN"s infrastructure. JMHO
Gold mineralized zones in the form of discrete high grade lodes and a broad zone of disseminated sulphides hosted by garnet-silica altered amphibolite in a corridor defined by artisanal workings and outcropping mineralized material are known to exist along a minimum of 1600 meters of strike and across from 300 to 500 meters. The host envelope and the mineralized zones dip at 15 to 25 degrees and the true width of the target zone is approximately 200 to 250 meters. The area is traversed by gravel roads and the topography is moderate. The project can be advanced rapidly without significant infrastructure enhancements.