RE: Drill time?If they are testing the lower part of the formation now, that is going to take a week or two to perforate, run a packer, acidize if they try that again.
Rig move will likely take a month as per the last one. It is a fair distance and a lot of truckloads to move the rig and camp. Only saving grace is they are returning to a previous site so most everything should still be in place.
Once in place, it is not just a matter of tripping down the hole and drilling 100 meters. There is the casing to mill a window in, probably a plug to set to kick the sidetrack off and etc. etc.. They may even get exotic and try to cut and retrieve some of the casing from the sidetrack on Sarqala 1 and re-enter that way.