RE: RE: RE: RE: WTF IS GOING ON???"During August 2010, the Ezulwini mine closed its uranium plant to replace two columns in the Ion Exchange section, following a structural failure on a loading column. The two columns are being manufactured, with installation and commissioning expected to be completed in Q4 2011. The cost of the two failed columns that have to be replaced has been written off and expensed in Q2 2011."
Q2 2011 is the quarter ended September 2010. The end of the year is December 2010. Q4 2011 begins January 2011, so the replacement will happen 1-3 months later than previously reported.