Worth a Look - SilverWith silver in for a parabolic rise in prices and us holding these results and another play with GBR I cannot fathom a price of .155. It is insane, we are about as undervalued as they come. The only reason is the previous reputation of company and may indeed open their eyes that they might actually have something here and to maybe promote it as a real play. JMO
These are Sep results for GBR.
Ongoing drilling has completed a total of sixty nine drill holes at BA. Results from sixteen of these holes drilled in and around the Main zone are included in this release. Eleven of sixteen holes successfully intersected silver mineralization with an average drill intersected width of 6.9 metres and a weighted average grade of 104 g/t silver. Seven of these holes intersected higher grade mineralization with an average drill indicated width of 5.2 metres and weighted average grade of 153 g/t silver. Highlights are summarized in the table below.
--------------------------------------------------------------------------- IntervalBA Drill Total Interval Interval Length Silver Lead ZincHole Length (m) From (m) To (m) (m) g/t % %---------------------------------------------------------------------------BA-2010-77 172.21 0.40 47.24 46.84 18.2 0.18 0.75 including 41.50 47.24 5.74 61.6 0.48 1.58---------------------------------------------------------------------------BA-2010-78 203.00 0.25 59.74 59.49 26.7 0.18 1.17 including 0.25 7.92 7.67 35.3 0.24 1.54 including 10.97 17.07 6.10 119.0 0.74 6.28 including 41.45 47.55 6.10 55.26 0.32 1.27---------------------------------------------------------------------------BA-2010-80 163.07 7.62 53.34 45.72 25.15 0.18 0.50 including 16.06 24.90 8.84 62.8 0.32 0.79 including 38.10 41.15 3.05 85.0 0.95 1.26---------------------------------------------------------------------------BA-2010-81 176.90 5.42 92.37 86.95 28.2 0.12 0.42 including 44.81 50.90 6.09 173.7 0.30 1.08 including 65.97 69.34 3.37 132.0 0.06 0.06---------------------------------------------------------------------------BA-2010-82 219.15 8.84 170.39 161.55 22.1 0.25 0.38 including 17.98 21.03 3.05 34.0 0.49 1.99 including 45.42 71.30 25.88 80.3 0.70 0.47 above includes 54.90 60.66 5.76 229.3 2.19 0.81 including 121.62 130.76 9.14 47.5 0.81 1.39---------------------------------------------------------------------------BA-2010-83 151.49 8.23 127.10 118.87 26.1 0.21 0.58 including 76.90 94.20 17.30 87.9 0.62 1.74 above includes 84.43 87.48 8.43 165.0 0.40 3.17---------------------------------------------------------------------------BA-2010-84 163.68 14.33 142.34 128.01 18.1 0.17 0.62 including 61.25 64.89 3.68 52.0 0.45 2.66 including 72.24 75.29 3.05 69.0 0.42 3.65 including 78.33 93.57 15.24 34.0 0.18 1.00 including 127.10 130.15 3.05 56.0 1.67 2.35---------------------------------------------------------------------------BA-2010-85 221.59 8.23 102.72 94.49 26.6 0.20 0.44 including 70.60 75.29 4.69 32.9 1.19 0.41 including 88.60 99.60 9.00 87.0 0.06 1.08 above includes 90.53 93.57 3.04 129.0 0.08 1.34---------------------------------------------------------------------------BA-2010-86 197.25 17.37 20.42 3.05 19.0 0.11 0.23---------------------------------------------------------------------------BA-2010-87 147.00 28.59 31.50 2.91 26.0 0.16 1.39---------------------------------------------------------------------------BA-2010-88 151.49 5.18 8.23 3.05 40.0 0.16 0.27---------------------------------------------------------------------------BA-2010-89 166.77 41.52 44.36 3.44 26.0 0.28 1.07---------------------------------------------------------------------------BA-2010-90 172.82 47.85 108.81 60.96 35.8 0.23 0.58 including 53.95 87.48 33.53 55.6 0.33 0.79 above includes 72.24 78.33 6.09 129.0 0.04 0.97---------------------------------------------------------------------------BA-2010-91 212.45 53.20 117.96 64.76 28.3 0.22 0.71 including 58.50 65.70 7.20 59.37 0.41 1.80---------------------------------------------------------------------------BA-2010-92 236.83 66.28 124.05 57.77 30.7 0.20 0.64 including 78.33 102.72 24.39 56.6 0.32 1.20 above includes 96.62 102.72 6.10 73.0 0.17 1.60---------------------------------------------------------------------------BA-2010-96 166.73 10.97 14.02 3.05 13.0 0.11 0.17---------------------------------------------------------------------------
Eight of the sixteen drill holes reported above contain more than one higher grade interval within a broad VMS mineralized system. Complete drill results and a drill hole location map will be posted to the Company's web site. The drill holes reported above test the northern 200 metres of the 600 metre historically drilled strike length of the Main zone.
Twenty nine drill holes have been completed to date across the North Extension. Results of this drilling will be released upon receipt of complete assays.
The Bod Zone - VMS Mineralization Extended
A new zone of silver-copper-zinc mineralization (the "Bod" zone) has been discovered in the North Extension, 1.3 kilometres north of the Main zone. Highlights of trench results are provided in the table below.
-------------------------------------------------------------------------- TrenchBod Trench Length (m) Silver g/t Copper % Lead % Zinc %--------------------------------------------------------------------------61255 1.5 19 0.02 0.01 0.2761258 4.4 19 0.07 0.06 0.1161260 5.0 21 - 0.16 0.8861263 2.8 43 0.08 0.02 0.5161264 2.5 56 0.19 0.02 0.6261265 1.3 105 0.80 0.04 0.5561266 1.3 43 0.39 0.02 0.2561267 3.1 54 0.29 0.03 0.18
The new discovery of this silver-copper-zinc mineralization zone extends the strike length of known VMS mineralization at BA from 600 metres to in excess of 2 kilometres. The main mineralized corridor, occurs along a southwest to northeast trend. Continuity and width of this corridor are currently being drill tested.
The