TSXV:CLAS.H - Post by User
Comment by
gregoooon Nov 22, 2010 8:34pm
400 Views
Post# 17742524
RE: rig
RE: riglooks like they are using a coiled tubing unit - from the press release :
DST 5, Lower Mirador, perforated 14,297 to 14,292 feet, five feet: coiled tubing was run to 6,000 feet and 500 standard cubic feet per minute of nitrogen was pumped to remove the fluid cushion, and achieved a drawdown of approximately 17 per cent. Fluid production rates averaged 2,225 barrels per day of 20.7-degree API oil with a trace of water during the test.