RE: Re-entry prizeis the answer to the recompletion in valueras PR this morning?
Completed the first recompletion at the NE Ogunduk-1 well in Rubai licence 2599 and demonstrated producibility of 30 to 50 bopd of 15º API gravity oil at a high water-cut. The well was drilled in 2009 in an apparent flank position on the structure. The well is temporarily suspended pending the results of a possible appraisal well to be spudded at the end of January 2011 targeting a higher structural position to be confirmed with new 2D seismic to be shot in December 2010