GREY:RGVNF - Post by User
Post by
curtisprodon Dec 02, 2010 3:48pm
187 Views
Post# 17791706
Ammended MD&A
Ammended MD&AMD&A 11/30/2010
This Nitrogen
cleanup was successful and a lower perimeter gas flow test was performed the following week. Initial test
was performed by the operator using 3/16" choke and showed the well capable of producing a minimum
of 250 million cubic feet per day.
MD&A AMMENDED 12/1/2010
This Nitrogencleanup was successful and a lower perimeter gas flow test was performed the following week. Initial test
was performed by the operator using 3/16" choke and showed the well capable of producing a minimum
of 250 mcf (thousand cubic feet) per day.
Therefore Stocky and my last guess are correct and I consider this matter settled at 250,000 cf/d