RE: 500,000 tonnes of wasteNot waste from the plant, waste to ore in the pit, to get one tonne of ore from pinecove deposit to the plant, you have to move an average of 3 to 4 tonnes of waste rock, so 800 tonnes per day in plant, other 2400 to 3200 tonnes of waste has to be
moved out of the deposit in order to keep up, looking at the pit the other day, it doesnt look good.