GREY:KXLAF - Post by User
Post by
red911on Mar 16, 2011 12:54pm
337 Views
Post# 18293631
3 drill rigs...
3 drill rigs...Jan 13th... "Currently there are two drill rigs operating at the Magino mine site, with a third drill rig to be added later this month." 3 drill rigs going since late-Jan. This NR was for 1800m of 20,000m planned... With 2 rigs going for at least 2 months and 3 rigs going for about 1.5 months you can safely assume they have drilled much more than 1800m thus far. Based on these initial results I would bet the drill was very confidentially guided to numerous targets of interest. Should be many more releases like this to come IMO. Should also likely be a few surprises along the way... they did acquire new land around Magino and we do get a hint of 'undrilled zones' in latest NR. Just saying. red911