Results due out soon! Could be big!First hole completed as stated in the 3/8 news release. Last results were very good. TJT could have some really decent results from this 4000 meter program. I have been picking away some at the .14 - .15 range.
Another great spec play.
Trijet Mining Corp. Completes First Hole of Phase II Drilling at Letourneur3/8/2011 5:57 AM - NW
(via Thenewswire.ca)
March 8, 2011, Vancouver, British Columbia: Trijet Mining Corp.("Trijet' or the "Company") (TJT.V, TRJTF.PK) announces that the Companyhas been informed by its Senior Geologist, Michel Boily, Ph D., P.Geo., that the first drill hole of the Company's Phase II drill programat the Letourneur gold project has been completed to a depth of 180meters and drilling of the second hole has commenced.
The Letourneur project is located in the prolific gold producing Abitibiregion of southwestern Quebec, 41 km north of Rouyn-Noranda, in theregional municipality of Taschereau, Privat Township. Subsequent to theadditional staking of claims, the property now consists of 80 mineralclaims (polygons) for a total area of approximately 4,300 hectares(10,600 acres). The property is underlain by Archean volcanic rocks ofthe Hunter Mine Group in the Abitibi Greenstone Belt. The stratigraphiccolumn is dominated by massive to pillowed andesitic tholeiitic lavas,mafic tuffs and iron formations overlying a sequence of calco-alcalineandesitic to dacitic lavas and tuffs.
As reported by the Company on September 28, 2010, the Phase I drillingcampaign, completed in the summer 2010, consisted of 15 drill holes ofwhich 10 holes intersected gold bearing mineralization. Here is asummary of the best intersections from Phase I:
- Drill-hole LE 2010-11 intersected at shallow depth 16 meters of1.33g/t Au from 17.2m to 33.2m, including 4.2m of 4.7g/t (0.15oz/t)Aufrom 17.20m to21.40 m.
-Drill-hole LE 2010-10 intersected high grade gold of 16.82 g/t (0.6 oz/t) Au over 1.90 meters from 40.45m to 42.35m.
The Phase II drill program will consist of 4,000 meters, includingseveral holes in the vicinity of the best intersections cited above. Thefirst 14 holes of will be aligned parallel to and situated on thenorthern side of the Lois Lake fault which defines a structural boundarybetween the mafic tholeiitic and felsic calco-alcaline volcanicassemblages. The fault extends along an ENE-WSW direction for 3.3kilometers.
A Technical Report on the Letourneur project is available on the Companywebsite athttps://www.trijetmining.com/Letourneur%20Property%20Summary.pdf. MichelBoily, a
"Qualified Person" has reviewed the technical aspects of this release.For more information please call 604-669-4367 or MI3 FinancialCommunications Inc. at 514-904-1333.
On behalf of the Board,
"Paul Shatzko"
Paul Shatzko
President