Total depth = 2400 mif they are drilling to only 2400 m, and assuming 2 m per hour penetration rate, drilling can be completed in 50 to 60 days.
The well is shallow and so drilling cost should also be low and wouldn't be like deeper wells drilled by VST and WZR.
if they hit oil, this would be one of the few shallow fields in KRG.