TakeoverLike all junior miner the goal is to prove up a property and then be taken over by a major. BTR needs to drill more hole and establish the total lengh and width od the ore body and comlete a 43-101 so tha a feasibility study can be done on the economics of a mine are established. They have made a great start on this voyage and it is obvious that the company thinks that the best is yet to come with planned drilling throughout the summer. The next release of assays from the drilled holes [probably next week] should give an ever better idea of what is in the ground. At this time this looks like a property with a lot of potential.