RE: RE: RE: RE: RE: Fraccing and spacing approved!The long time line is due to the connection into the Williams pipeline. This is a federally regulated pipeline( thorough FERC).The regs state up to 9 months so that is longest possible time allowed under the regs. Its most likely will be much shorter than this but BUK are being conservative with their timing.
Bigbadun'