RE: RE: RE: QuestionChappy, re your recent post:
One constraint is the tailings. There are 3 tailings options in theinitial pre-feasibility study but there has always been one clearfavourite: Option A, Skeeter Lake. With the original resourceengineering, the Option A scenario would require a 200m high dam on thenorth end of the Skeeter valley. If we double or triple the amount oftailings processed this scenario will require some significantre-engineering of a very significant structure. It could be that thereis an upper limit that may constrain the overall project. The othertailings options have some significant geophysical hazards that may betoo risky to be realized.
Outstanding idea. I'd overlooked this issue completely. You've done excellent research, once again.