RE: Flow tests1 st test could be bottom hole to into the 7 inch casing which would mean they cased a productive zone and checking the meters below the cased production, making for a great test seating for the test tools,. Test 2 would be behind the 7 inch casing and test three would be the upper new find (would also case the lower end after testing into the 7 inch so all hole would be stable and secure) just my humble thoughts