RE: Too early for Cardiff, it's supposed toIm positive I read in some report that interviews TAG that as soon as the drilling rig was released from Sidewinder they were bringing in a smaller workover rig to commencve completions and flow testing at Sidewinder, and that was scheduled for late april erly May. This article was from end of MArch I do believe. I suspect the recent run up to be a leak of news on perhaps maybe the first flow test, perhaps they hit strong oil if were lucky. The above normal volume the one day was a big signal as TAG rarely has large volume days. Time will tell but I think next couple weeks could be very interesting and rewarding.