RE: Phosphate Drilling
Hi Kriskeri,
I'm always interested in reading your posts.
Can you tell me how you know GQ are drilling every 100m, I see reference to every 250m, however not based on 100 meter centres.
From a previous NR the company estimates they have completed 38 holes, covering 10 square km, so a 100 holes would equate on a similiar path.
I am looking forward to hearing the thickness of the phosphate, grades and continuity.
I wonder if when the assay's are returned whether it will break down the compound elements, including calcium.
Good luck to all longs.