RE: RE: RE: RE: RE: By mid June
Mr Leveille said that time to do the geophysical survey is 2 or 3 weeks. He write that they want to start as soon as possible when the boat is available. The vessel was to be free towards mid-June but following the prolongation d' a contract it will be it a little later. We will receive confirmation soon. The program is used to define the contour and to position with precision the sites of futur sampling. After they can do a trial mining!
Nick