GREY:MPRXF - Post by User
Comment by
threepalmson Aug 10, 2011 8:55pm
184 Views
Post# 18928996
RE: RE: RE: RE: Hole 1 at 2567m
RE: RE: RE: RE: Hole 1 at 2567mhere is the scoop.
Hole 1 as we all know now has a significant fault issue at the 2600 metre depth.
From the point of expected and wanted geology that is a very positive sign.
Because of the previous experience at this depth management and drilling crews know that it will take some time to navigate through this zone but we will get it done.
Wedge reset so that we can take another crack at getting through this fault without getting stuck.
I say this because we all know the potential prize when we do.
Hole 3 is in equipment maintenance mode.
Specifically, new motor is being brought in for hoisting system.
I too was concerned about the lack of progress and contacted management and they provided me with this update.
I hope this helps those that are loosing patience reason to hang in just a little longer.