Silver is up too $42We produced and sold 27,000 oz lasted 7 week reported period
RESULTS
Month of
March 2011
April 1 through
April 22, 2011
Tonnes Processed 6,112 tonnes 3,771 tonnes
Gold Grade 1.7 g/t 1.56 g/t
Silver Grade 177 g/t 179.81 g/t
Gold Recovery 93 % 91 %
Silver Recovery 49 % 47.52 %
Gold Produced 316.9 ounces 172.1 ounces
Gold Sold 312.16 ounces 169.52 ounces
Silver Produced 16,929.5 ounces 10,359.7 ounces
Silver Sold 16,421.62 ounces 10,048.91 ounces
Gold Equivalent Produced 742.68 ounces 462.3 ounces