Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

PMI GOLD CORPORATION PMVGF



GREY:PMVGF - Post by User

Post by 4uon Sep 27, 2011 5:50pm
227 Views
Post# 19090662

News...Kubi Auger Results

News...Kubi Auger Results

Further Kubi Auger Results Increases Drill Targets

Canada NewsWire

/THIS NEWS RELEASE IS NOT FOR DISTRIBUTION IN THE UNITED STATES OR TO U.S. NEWS AGENCIES/

VANCOUVER, Sept. 27, 2011 /CNW/ -

Key Points:

  • Numerous 100-400m long +2g/t anomalies defined by ongoing shallow auger drilling program at the Kubi Project
  • Significant anomalies defined along and west of the Ashanti Shear and along Kubi Shear south of the Kubi Main Deposit
  • The 513 Prospect has been extended over 1km in strike length
  • Results reveal four main east-northeast trending structural corridors containing multiple gold anomalism (+40ppb) targets.
  • The Kubi Project is located on the north-east trending Ashanti Shear, which controls the world-class Ashanti Obuasi Gold Mine (60Moz), 15km to the north, and a series of cross-cutting east-northeast trending structures which coincide with Perseus Mining's 6.6Moz Edikan Gold Mine, 12km to the south-west.
  • Deep (RAB, RC and DD) drill program to follow-up outlined drill targets in Q4 2011

PMI Gold Corporation (TSX-V: PMV; ASX: PVM) is pleased to advise that new assays from a continuing auger drilling program have identified several additional targets and strike extensions of previous discoveries, see Figure 1.

Drilling Results - Kubi Project

The Kubi Project is located 65km east of PMI Gold's Obotan Gold Project, 15km immediately south along strike from the world-class Obuasi gold mining complex (owned by AngloGold Ashanti), which has a pre-mine endowment of about 60Moz, and 12km north east of the recently commissioned 6.6Moz Edikan Gold Mine (owned by Perseus Mining).

Exploration by previous explorers at Kubi indicates that near-surface gold anomalism is extensively distributed along the Ashanti and Kubi Shears the bounding structures of the belt dominant Ashanti Shear Zone, however deeper drilling has only been carried out at isolated locations, and was principally focussed at the Kubi Main Deposit on the Kubi Shear and on geophysical anomalies, and none of the previous deeper drilling tested the recent anomalous auger targets. Much of the 15km long Ashanti Shear Zone within PMI's concessions remains untested by drilling. The PMI Gold auger program will for the first time systematically test the entire Ashanti Shear Zone, surrounding country rocks and areas of alluvial cover within PMI's concession area.

The latest assay results reveal more than ten 100-400m long, +2000ppb (+2g/t) gold anomalies within several broader +80ppb NE-SW trending anomalous zones enveloping the Ashanti and Kubi Shears, internally within the shears and to the west of the Ashanti Shear.

Of particular interest are:

  • An open +200m long 2000ppb anomaly corresponding to the Ashanti Shear
  • A 1km southerly extension of the 513 Prospect (see ASX/TSX announcements dated 7 January, 2010 and 10 December, 2010)
  • A complex anomalous zone 500m west of the Ashanti Shear
  • A strong +500m, 2000ppb anomaly corresponding to the Kubi Shear about 300m south of the Kubi Main Deposit
  • Possible E-NE trending structures which appear to control the distribution of the anomalies, see Figure 2.

The 513 Prospect, which is located 1.4km to the south-west of the Kubi Main Deposit close to the Ashanti Shear, is a recent discovery that demonstrates the exploration potential at Kubi, with diamond drilling returning intersections of 4.75m @ 3.76g/t Au from 85m, 8.00m @ 3.68g/t Au from 64m and 1.00m @ 15.35g/t Au from 66m.

The auger drilling program was undertaken on an initial line spacing of 200m apart, with holes drilled at a 25m on-line spacing to depths of 3-6 metres. Additional in-fill drilling was carried out on 100m spaced lines in areas of anomalism. The saprolite horizon was sampled to overcome the masking effects of the transported overburden. Samples were assayed by 'bottle-roll' technique using up to 2kg samples with a 24-hour residence time. Results were reported with a detection limit of 2ppb.

To date, a total of 8,623m has been drilled representing 86% of the auger program. Approximately 1,800 assays are awaiting analysis. The attached grade contour diagram (see Figure 2) is based on the first 2,401 assay results received by PMI.

PMI's Managing Director Collin Ellison said "The latest results continued to highlight the significant potential for high-grade gold mineralisation along the Ashanti Shear and the parallel Kubi Shear. The auger drilling has successfully defined extensions to the 513 Prospect and the occurrence of at least four east-northeast corridors that contain multiple gold anomalous targets. These corridors are contained within the same series of east-northeast trending structures that coincide with Perseus's Edikan Gold Mine. PMI will complete the current auger program before commencing a follow up exploration program employing Rotary Airblast (RAB)/Aircore and Reverse Circulation (RC) drilling, scheduled to commence in Q4 2011".

"Many of the largest gold mines in Ghana have a short strike extent with substantial steep plunging deep roots and we are looking forward to the arrival in country of our dedicated RC and Air Core drill rigs to enable the deep testing of the Kubi Project auger targets and numerous geochemical and structural targets within the Asankrangwa Project south of Obotan".

PMI will also be completing a re-evaluation of the Kubi Main Deposit as part of the reassessment of the development strategy for Kubi.

The Kubi Project is the second project that PMI is currently developing. The main focus during the 2011 has been with the Obotan Project which is at an advanced stage and where PMI are presently developing a Pre-feasibility Study and anticipates releasing a new resource estimate before the end of September 2011. PMI is also developing the Asankrangwa Exploration Project which is located to the south of the Obotan Project and where PMI have numerous mineralised drill targets that are to be tested in the coming months.


Kubi Resources: Measured Resource of 0.66 million tonnes grading 5.30 g/t gold for 112,000oz; Indicated Resource of 0.66 million tonnes grading 5.65g/t gold for 121,000oz; Inferred Resource of 0.67 million tonnes grading 5.31 g/t gold for 115,000oz., as reported in the December 3, 2010 technical report prepared by SEMS Exploration Services Ltd., available at www.sedar.com.

<< Previous
Bullboard Posts
Next >>