GREY:HRTPF - Post by User
Post by
kentoon Sep 28, 2011 1:10pm
379 Views
Post# 19093934
DRILLING RATES
DRILLING RATES
THE REVISED TIME TO TOTAL DEPTH IS AS FOLLOWS:
WELL #2 WELL #4
TOTAL DEPTH ( METRES) 3500 2700
AVERAGE DAILY DRILL RATE 16/9 29.6M 38.3M
AVERAGE DAILY DRILL RATE 23/9 35.8M 42.3M
PREDICTED DATE TO TD 16/9 31ST OCT 21ST OCT
PREDICTED DATE TO TD 23/9 12TH OCT 18TH OCT
DRILLING PHASE 3 3
NOTE : 1) DRILLING RATES IMPROVED BECAUSE OF BETTER WEATHER CONDITIONS. BAD WEATHER RETURNS IN NOVEMBER.
2) WELL #2 TARGETS OIL/GAS WHILE WELL #4 TARGETS A PROVEN MASSIVE "SUPER STRUCTURE" IN A FIELD LIKELY COMMON TO HRT AND PETROBRAS.
3) WITH POSITIVE RESULTS IN WELLS 1 AND 3 WE HAVE ALREADY ACHIEVED THE HISTORICAL SUCCESS RATE OF 50%. THE CHANCE OF SUCCESS IN WELL # 4 IS 90% WHILE THE CHANCE OF SUCCESS IN WELL #2 IS OVER 50%
4) ALL THINGS BEING EQUAL, RESULTS FOR BOTH WELLS LIKELY WITHIN THE NEXT 4 WEEKS.