RE: Economic StudyIf I owned the stock then I'd ask the company directly. Grade could be dilution during mining. For example, if you're mining a 1.5m seam, but your equipment needs 2m to operate then you will have to blast some waste along with the ore. Payable is maybe because they plan to ship a concentrate instead of dore.