Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Centamin Ord Shs T.CEE

Alternate Symbol(s):  CELTF

Centamin plc is a Jersey-based gold producer. Its assets include Sukari Gold Mine, Doropo Gold Project and ABC Project. The Sukari is a bulk tonnage open pit and a high-grade underground operation, with significant exploration upside at depth and regionally, within the 160 square kilometers (km2) tenement. The Doropo Project consists of seven exploration permits, covering an area of over 1,850 km2. The Doropo Project is in the northeast of Cote d’Ivoire, over 480 kilometers (km) north of Abidjan. The ABC Project is in northwest Cote d'Ivoire, over 550 km northwest of Abidjan and 460 km west of Centamin's Doropo project. Its EDX Blocks comprise 3,000 km2 of greenfield exploration tenements within the Egyptian section of the Arabian Nubian Shield. The land package is divided into three blocks: Nugrus Block, which covers over 1,086 km2, Um Rus Block, which is located 50 km north of Sukari, and Najd Block, which is located 100 km northwest of Sukari in the Central Eastern Desert.


TSX:CEE - Post by User

Bullboard Posts
Post by shrubcrawleron Oct 11, 2011 8:09am
454 Views
Post# 19136052

NR->Q3 2011 Prelim Report

NR->Q3 2011 Prelim ReportCentamin Egypt Limited 3rd Quarter Preliminary Production Results10/11/2011 2:01 AM - Market WireTORONTO, ONTARIO, Oct 11, 2011 (MARKETWIRE via COMTEX News Network) --Centamin Egypt Limited ("Centamin" or "the Company") (TSX: CEE)(LSE: CEY) is pleased to announce its preliminary production results from its Sukari Gold Project in Egypt for the quarter ended 30 September 2011.Total gold production for the quarter was 50,539 ounces, a 67% increase from the corresponding quarter last year and a 5% increase on the previous quarter's production. The resultant gold production was underpinned by record quarterly throughput in the Sukari process plant of 964kt (59% higher than the corresponding quarter last year and 13% higher than the previous quarter), as the ramp up to higher production rates progressed post-Stage 3 commissioning.Open pit and underground production rates returned to budgeted production rates with the resumption of regular delivery and issuing of blasting products for the mine in late July. The open pit delivered greater than 2.2Mt per month material movement for both August and September (compared with 1.2Mt in July) and underground ore production for the quarter increased to 58,000t (up 35% on Q2 2011). With higher material movements from the open pit, the run of mine ore stockpile balance increased by 168kt to 456kt by the end of the quarter.Centamin remains on track to reach target production of 200-210,000oz at a cash cost of approximately $550/oz in 2011.---------------------------------------------------------------------------- September 2011 Quarter June 2011 September 2010 (estimate) Quarter Quarter----------------------------------------------------------------------------Total Material Movement - Open Pit (kt) 5,747 3,030 4,916----------------------------------------------------------------------------Process Plant Throughput (kt) 964 850 605----------------------------------------------------------------------------Underground Ore Production (kt) 58 43 -----------------------------------------------------------------------------Gold Produced (oz) 50,539 47,991 30,243---------------------------------------------------------------------------- Josef El-Raghy, Chairman of Centamin, said: "The Company is pleased with the return to normal operations, the rapidly improving performance of the process plant and the consistent development and maturing of the underground operation, which positions Sukari well for a strong and consistent performance in the future."Notice of ResultsCentamin will announce its results for the quarter ended 30 September 2011 (Q3) on Monday, 31 October 2011. The announcement will be screened via the Regulatory News Service of the London Stock Exchange at 7am (UK time). A conference call with the Centamin management team will be held at 11am (UK time) on the day of the Q3 results announcement. Dial in details for the conference call will be announced at the time of the Q3 results.ABN 86 007 700 352Contacts:Centamin Egypt LimitedJosef El-RaghyExecutive Chairman+61 8 9316 2640 or +20 3 5411 259Centamin Egypt LimitedKatharine SuttonHead of Investor Relations+61 8 9316 2640 or +20 3 5411 259katharine.sutton@centamin.comwww.centamin.comBuchananBobby Morse+44 (0) 20 7466 5000BuchananGabriella Clinkard+44 (0) 20 7466 5000 SOURCE: Centamin Egypt Limitedmailto:katharine.sutton@centamin.com https://www.centamin.comCopyright 2011 Marketwire, Inc., All rights reserved
Bullboard Posts