RE: MacklinTUSCANY COMMENCES EVESHAM AND MACKLIN, SASKATCHEWAN, DEVELOPMENT PROGRAM
TuscanyEnergy Ltd. has commenced a development drilling program to drill up tofive horizontal Dina heavy-oil wells in the Evesham and Macklin areas.
The first well located in the Evesham Dina pool has reached total depthand encountered 500 metres of oil-saturated porous sand. Tuscany has a60-per-cent interest in this well and is the operator. This well is thefirst to be drilled on the south side of the pool from a new productionpad.
<>After casing the Evesham well, the drilling rig is being moved to theMacklin area to drill two 50-metre offset wells to a well Tuscanyrecently drilled. This Dina oil well was placed on production Sept. 18,2011, and has steadily produced in excess of 100 barrels of oil per day(55 barrels of oil per day net) to date. Tuscany has a 55-per-centworking interest in the well and is the operator.Diaz has the other 45%.
The Macklin area sounds very promising,finally Diaz has stumbled on to a good area.