RE: RE: RE: RE: RE: RE: RE: NOT PROFITABLE(reply) As per the Dec 30, 2011 NR, all five super sections deploying 10 CMs should be in place in April, 2012 (3 months away). Each of the super sections will produce roughly 600K tons of saleable product. IF they can stick to this schedule, we're looking at a company that will be increasing production at a rate of some 600k tons every 2 weeks or so. Based on this schedule, as of this week, Cline should be producing a run rate of 500-600k tons. Talk about a ramp up. The moment of truth is here. GLTA