RE: M+I compared 2 P I think the lower grades have something to do with their revised mining plan?
From the press release, they said:
=============
Given that the shaft is
scheduled for commissioning in April, 2012, it was decided to bulk mine the El Valle/Boinás skarns by longhole stoping methods, followed by backfill, as opposed to the more selective cutand-fill methods in certain areas. The bulk mining of the skarns requires less development for
stope preparation and results in greater productivity
==============
maybe has something to do with the new Bulk mining vs selective methods. Just my uneducated guess. =)