VETTE exposed read till the end
Ok lets try this :
VETTE CLAIMS TODAY HE KNEW ABOUT DELAY IN FEB :
MESSAGE: ELMER HINTED THE DELAY, AND OTHER SIGNALS
ReplyNew Message« Prev MessageBack To ForumGo to Threaded ViewNext Message »
cuuvette350
Rank: [?] President
Elmer hinted the delay, and other signals
posted on Mar 21, 12 09:55AM (Log in to use the IP Check tool) [?]
I remember I was in Cuba, and read the 2011 Annual Financial Results Feb 28th. I read the mine plan comment and remember having that ''Oh great'', this will be late feeling.
The other signals:
Then Joanne sold....well she either needed tax money or she read into the annual financials as we all should have.
Then the low volume, selling pressure and walls, 3 weeks before the expected Feasibility study ?
The Hint from Elmer:
February 28, 2012
Copper Fox Reports 2011 Annual Financial Results and a Corporate Update
'Feasibility studies are complex and require a substantial amount of detailed engineering work with very narrow estimation limits. 'Tetra Tech WEI Inc. is currently working on a detailed mine plan including the first five years of mining operations. The mine plan includes, for example, detailed estimates of material movement, haulage distances and waste dumping locations. Mine planning is a fundamental part of the feasibility study and has a significant impact on the economics of the Schaft Creek deposit. Until this work is completed, completion of the feasibility study is not possible
LOOK AT WHAT VETTE WAS POSTING IN MARCH
MESSAGE: SEDI - JOANNE MCDONALD
ReplyNew Message« Prev MessageBack To ForumGo to Threaded ViewNext Message »
cuuvette350
Rank: [?] President
The blackout
in response to Re: SEDI - Joanne McDonald by cuuvette350
posted on Mar 07, 12 09:14PM (Log in to use the IP Check tool) [?]
I confirmed today with a call...some insiders with direct Feasibility info are blacked out (Elmer, Mike, Cam) the others are not blacked out.
Again eveything is on time and the Revised RE expected shortly after Feasibility.
I CHALLENGE HIM WITH THIS ON THE BLACKOUT
An email received from Michael Smith :
For obvious reasons the Company does not and is not allowed to publicly disclose when it is in a period of “black out.
Regards Mike
J Michael Smith
Executive Vice President
Copper Fox Metals Inc.
Suite 650, 340 - 12th Avenue SW
Calgary, AB T2R 1L5
Tel. 403 264 2820
Fax. 403 264 2920