PINL:VLTAF - Post by User
Comment by
gold_diggers1on Apr 18, 2012 12:01am
180 Views
Post# 19805843
RE: RE: This is IRR
RE: RE: This is IRR Yes, I agree with Curvature. And I should correct the term PEA as Preliminary Economic Assessment (not Pre Economic Assessment as said in my previous post). PFS is Pre-Feasibility Studies which is more involved/robust than a PEA. Then the FS (Feasibility Studies) will follow the PFS... FS is the one that is even more detailed in design, engineering etc... and is bankable studies i.e. totally dependable for mine development.
I hope I got the things right...
GLTA