RE: RE: RE: Very exciting now Hi TO1,
You imply current production is limited to around 6000 bopd and indeed the company did say that. But I'm not sure that includes production from AKD06. Or else is this piece from the recent annual information form already out of date?
The Doris (AKD06) appraisal well which targeted primarily the Cretaceous sandstone interval tested at a rate of over 4,300 bopd on a 26mm choke with a flowing tubing head pressure of 12.7 atmospheres (psi 186). The oil was light with a gravity of 0.8 SG (45 degrees API). Flow was restricted for safety reasons but data indicated that the absolute open flow potential is in excess of 6,000 bopd. The well is not tied into the test production facilities and further testing is planned in addition to placing the well on long term test production.