Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Goldrush Resources Ltd GDRRF



GREY:GDRRF - Post by User

Post by youngkidon May 01, 2012 9:43am
417 Views
Post# 19855783

News

News
And updated resources to be completed in 10 days as seen below in the NR.

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 05/01/12 -- Goldrush Resources Ltd. (TSX VENTURE:GOD)(OTCQX:GDRRF) ("Goldrush" or the "Company") is pleased to report assay results from the final 11 of 18 core holes drilled as part of a larger 10,140 metre fill-in program which included 98 reverse circulation ("RC") drill holes on the Company's Ronguen Gold Deposit in Burkina Faso, West Africa. Highlights of the drilling results include:

--  6.99 g/t Au over 5.15 metres, in hole KGRC11-049, from 82.85 to 88.0    metres --  1.71 g/t Au over 9.0 metres, including 4.1 g/t Au over 1.0 metre and    5.89 g/t Au over 1.0 metre, in hole KGRC11-047, from 98.0 to 107.0    metres --  0.83 g/t Au over 17.5 metres, in hole KGRC11-046, from 110.5 to 128.0    metres --  4.72 g/t Au over 3.0 metres, in hole KGRC11-053, from 66.5 to 69.5    metres 

The eleven core holes were collared on the southern margin of existing sections of the G2 Grid, the westernmost of two overlapping grids on the Ronguen deposit, and were designed (i) to test the down dip extension of mineralization previously intersected in holes drilled farther north on the same sections and (ii) to provide additional structural information on the deposit.

Core hole KGRC11-049 was drilled on section 140E and successfully traced, down dip, the mineralization identified in reverse circulation holes KGRR11-237 (29 metres of 1.64 g/t Au from 18 to 47 metres), KGRR11-236 (18 metres of 1.73 g/t Au from 46 to 64 metres) and KGRR11-235 (17 metres of 4.49 g/t Au from 66 to 83 metres). Core hole -049 was collared 65 metres south of hole -237, 40 metres south of hole -236 and 15 metres south of -235.

Core hole KGRC11-047 was drilled on section 220E and intersected a higher grade and longer interval of the mineralization than previously intersected in reverse circulation holes KGRR11-221 (4 metres of 2.12 g/t Au from 40 to 44 metres) and KGRR11-220 (1 metre of 1.01 g/t Au from 61 to 62 metres). Core hole -047 was collared 75 metres south of hole -221 and 40 metres south of hole -220.

Len Brownlie, President and CEO of Goldrush, noted: "These diamond drill hole results are the last drilling data that will be integrated into the Ronguen resource model and will allow our consultants to complete an updated resource estimate for the Ronguen gold deposit within 10 days. Going forward, an initial program of trenching and pitting has been designed to follow-up on the potential strike extension of the Ronguen South zone and to seek to confirm to the north of the Ronguen Main zone a potential parallel gold zone that has been identified by a resistivity high anomaly from a gradient induced polarization survey."

Assay Results

Significant intersections are noted above and in the following table:

----------------------------------------------------------------------------HOLE ID           Line   Station       X-WGS84       Y-WGS84   Z-WGS84  Grid                 (Grid                   (Grid                                             Co-ord)                 Co-ord)                              ----------------------------------------------------------------------------KGRC11-046         300    -158.5    655366.252    1466207.35   328.249    G2----------------------------------------------------------------------------KGRC11-047         220       -85    655317.184   1466304.819   326.786    G2----------------------------------------------------------------------------and                                                                         ----------------------------------------------------------------------------KGRC11-048         180     -77.5    655282.136   1466325.382   326.611    G2----------------------------------------------------------------------------KGRC11-049         140    -80.15    655243.749   1466337.452   326.626    G2----------------------------------------------------------------------------KGRC11-050          60    -114.7    655153.953   1466335.083   327.343    G2----------------------------------------------------------------------------KGRC11-053         700      24.2    655804.686   1466236.126   329.125    G2----------------------------------------------------------------------------and                                                                         --------------------------------------------------------------------------------------------------------------------------------------------------------HOLE ID            Hole      From        To   Vertical   Interval       Gold                 Length       (m)       (m)      Depth     (m)(2)      Grade                    (m)                         (m)(1)              (g Au/t)----------------------------------------------------------------------------KGRC11-046          173     110.5     128.0      103.3      17.50       0.83----------------------------------------------------------------------------KGRC11-047          128      92.0      93.5       80.3       1.50       1.92----------------------------------------------------------------------------and                          98.0     107.0       88.8       9.00       1.71----------------------------------------------------------------------------KGRC11-048          117      88.0      92.5       78.2       4.50       0.84----------------------------------------------------------------------------KGRC11-049          117      82.9      88.0       74.0       5.15       6.99----------------------------------------------------------------------------KGRC11-050          122      98.0     101.0       81.5       3.00       3.10----------------------------------------------------------------------------KGRC11-053          140      66.5      69.5       58.9       3.00       4.72----------------------------------------------------------------------------and                         111.0     112.0       96.6       1.00       0.62----------------------------------------------------------------------------                                                                            (1) "Vertical depth" is the calculated depth to the centre of the           intersection.                                                               (2) True widths are determined to be 90 to 95% of reported mineralized      intervals.                                                                  

Each of the eleven holes intersected anomalous gold mineralization defined as at least 1 metre of greater than 0.10 g/t

Au. Core hole lengths varied from 110 to 180 metres. All holes were drilled at an azimuth of 24 degrees. Hole -050 was inclined at -55 degrees, with the remaining holes at -60 degrees. A total of 1,065 metres were drilled in the eleven diamond drill holes, which were sampled using nominal one metre sampling intervals which can be modified by the logging geologist based on lithology, alteration and/or mineralization.

Ronguen Exploration Plan

A total of 98 RC holes consisting of 7,793 metres and 18 core holes totalling 2,347 metres were completed in the fall 2011 drilling program on the Ronguen gold deposit. A total of 1,325 linear metres in 13 trenches were also completed. The trench samples have been delivered to the assay laboratory and results will be announced when received and evaluated, but will not be able to be included in the soon to be received resource estimate.

Ronguen Deposit Mineralization

The Ronguen gold deposit is located within the northeastern part of the highly prospective Birimian age Boromo greenstone belt in Burkina Faso. The local geology at Ronguen is dominated by an east northeast ("ENE") trending metasedimentary sequence consisting of interlayered siltstone, mudstone and minor conglomerate that are intruded by plugs, and narrow dykes and sills of gabbroic composition. The Ronguen mineralized zone is located in the structural hanging wall of a major ENE thrust fault which recorded a tectonic transport direction towards the north. The mineralized deformation corridor represents a major ENE trending reverse fault zone, dipping moderately towards the south. Gold mineralization is found in both metasedimentary and mafic intrusive rocks. The gold mineralization is associated with quartz-carbonate veins/veinlets and with sulphides occurring as disseminations and patches, and in veinlets. Two sets of gold-bearing quartz veins are developed: subvertical shear veins parallel to the shear zone foliation and to the shear zone boundaries, and subhorizontal extension veins. Small quartz stockworks are present and represent a part of the gold mineralization.

Correction of information disclosed on March 14, 2012 regarding drill results on the Ouavousse Permit

Land surveys and title searches very recently conducted by the Company after the completion of the 2011 RC drill program, have revealed that the Ministry of Mines, Quarries and Energy of Burkina Faso in 2009 had inadvertently allowed the Company to extend the Ouavousse permit partially over a permit that was granted to another party in 2008, so that a small portion of the Company's Ouavousse permit extension conflicts with the existing permit boundary. No notice has been received by the Company from either the Government of Burkina Faso or the other permit holder to advise of this overlap. In the 2011 RC drill program, four of the 30 holes were drilled in this overlap area. Readers are cautioned that assays from these holes, OUKR11-027 to -030, that were disclosed in the Press Release dated March 14, 2012, should not be considered in evaluating the prospectivity of the Ouavousse permit. The Company has approached the Ministry of Mines and Quarries to rectify this situation, however the outcome of this matter cannot be determined at this time.

 

<< Previous
Bullboard Posts
Next >>