Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Candelaria Mining Corp T.CAN


Primary Symbol: V.CAND Alternate Symbol(s):  CDELF

Candelaria Mining Corp. is a Canadian gold-copper exploration company with a portfolio of two highly prospective projects in Mexico. The Company owns 100% of the Caballo Blanco and the Pinos Gold Projects. The Caballo Blanco license area is located on the eastern coast of Mexico in the state of Veracruz, 65 kilometers northwest of the city of Veracruz. The most advanced project in the license area is La Paila, which is conventional open pit/heap leach mining operation targeting approximately 100,000 ounces of gold production annually. The Pinos mining property and historical mining district is located in the municipality of Pinos, Zacatecas state in north-central Mexico near the town of Pinos, Zacatecas. The property lies 405 air-kilometers northwest of Mexico City and is 67 km west-northwest of the city of San Luis Potosi, 113 km east-southeast of the city of Zacatecas, and 85 km northeast of the city of Aguascalientes.


TSXV:CAND - Post by User

Post by freemax2on May 09, 2012 6:56am
228 Views
Post# 19888206

!!!!!!!!!!!!!!!!!!!!!!!! NEWS !!!!!!!!!!!!!!!!!!!!

!!!!!!!!!!!!!!!!!!!!!!!! NEWS !!!!!!!!!!!!!!!!!!!!

GREAT!!

May 09, 2012 06:00 ET

Canaco Completes Magambazi Delineation Drill Program and Reports Additional Drill Results from Magambazi, Including 10.5 Metres at 7.83 Grams per Tonne Gold

VANCOUVER, BRITISH COLUMBIA--(Marketwire - May 9, 2012) -Canaco Resources Inc. (TSX VENTURE:CAN) ("Canaco" or the "Company") is pleased to announce the remaining outstanding delineation drill results for the purposes of calculating an initial mineral resource estimate at the Magambazi gold project in Tanzania. These results include 117 new holes and updates to three previously reported holes. All drill results related to the upcoming initial mineral resource estimate have now been released. The initial mineral resource estimate in on track for completion by May 15, 2012, and will include approximately 400 holes totalling 100,000 metres.

Highlights of the current results include:

  • Infill intersections to the central Western Lodes;
  • Infill drilling on shallow intersections of Magambazi Main; and
  • Confirmation of up-dip continuity on the western flank of the Magambazi North near-surface mineralization.

Highlights include:

Hole
(1)(2)
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Lode(s)
MGZD174 72.4 78.0 5.6 3.67 Magambazi Main (lower)
and 83.6 94.1 10.5 7.83
MGZD201 262.5 266.0 3.5 7.30 Western Lodes
and 278.6 282.8 4.2 6.27
MGZD264 258.0 263.6 5.6 3.06 Western Lodes
MGZD340 288.0 294.0 6.0 3.13 Western Lodes
MGZD395 257.0 265.3 8.3 2.17 Western Lodes (east extension)
MGZD413 214.0 218.9 4.9 5.13 Western Lode (upper)
MGZD432 18.7 22.2 3.5 22.05 Magambazi North
(1) Mineralized true thicknesses are 60-100% of stated thicknesses. The calculation of drill intercepts employs a 0.3 gram/tonne cut-off and no cutting grade has been applied to high gold values.
(2) Not all drill holes identified in this release have had a full sample submission completed as planned. Additional results will be released and posted as received.

Click here: https://media3.marketwire.com/docs/can509_Map-DHI.pdf for a plan view map and complete list of drill hole intercepts.

Intersections noted have provided infill and extension information for purposes of definition drilling. Diamond drilling has closed off the immediate lateral northern, western, and southern extensions of significant mineralization, with as-yet undrilled extension-potential being identified at depth to the west. The majority of the drill results reported here relate to the completion of lower priority assays related to the upcoming mineral resource estimate. The upcoming mineral resource estimate will be based on assay results and geologic information obtained from approximately 400 holes totalling 100,000 metres of drilling at Magambazi.

Remaining core from recent regional drilling continues to be processed. Geological follow-up studies have been initiated and continued data compilation will assist in establishing additional targets.

Quality Control

The planning, execution and monitoring of Canaco's quality control programs at the Handeni project are under the supervision of Jeff Heidema, P.Geo., Canaco's Vice President Exploration, Mr. Heidema is a Qualified Person as defined by National Instrument 43-101. Diamond drill samples are prepared and analyzed at the SGS Geochemical Laboratory in Mwanza, Tanzania. RC drill samples are prepared at the ALS Chemex Laboratories in Mwanza, Tanzania and analyzed at their facilities in Johannesburg, South Africa. Samples are processed by Fire Assay with A.A. finish under the SGS FAA505 and ALS Au-AA24 protocols. Additionally, core samples analyses are conducted at Acme Labs in Vancouver, Canada, and undergo Fire Assay Fusion Gold by ICP-ES and lead collection fire assay-gravimetric finish. Canaco utilizes an industry standard QA/QC protocol with respect to sampling procedures. Blanks and certified reference standards are inserted into the sample stream to monitor laboratory performance, and duplicates of core, rejects, and pulps are also used to monitor laboratory performance and characterize mineralization. Mineralized true thicknesses are 60-100% of stated thicknesses throughout this release.

<< Previous
Bullboard Posts
Next >>