The open pit Florida NW continues Open pit mining operations continue at NW Florida. To date, more than 12,000 tons have been hauled to the plant with average grades of 1.6 g/t Au and 256 g/t Ag. Also, it is expected to add around 40,000 tons of mineralized material at the Tajo (1350 level) with similar grades.
In order to carry out the measurement of mineralized material that complies with protocol, seven trenches were made that showed the following grades, 0.77 g/t Au and 150 g/t Ag over a width of 13m, over a length of 30m at the SE end with NW direction.