GREY:MGMCF - Post by User
Post by
geodude13on Jun 24, 2012 8:26am
395 Views
Post# 20048570
One well - to be fracked near Tulita delayed
One well - to be fracked near Tulita delayed From the regulatory process, it looks like there was a single well planned for 2012. An application was processed and "further study" was the outcome largely on bureaucratic process on drill wastes and camp wastes. MGM will need to respond by July 6 which gets late for moving materials into the staging camp. Without a camp there is no drilling.
Latest letter of deferral is provided in the following link:
https://www.mvlwb.ca/slwb/Registry/2012/S12A-001%20-%20MGM%20Energy%20Corp/S12A-001%20-%20Further%20Study%20Requested%20-%20Jun-15_12.pdf
Regards