RE: RE: L53-D2ST3 discovery Birchjunk, I'm sure that all of the pay zone in the reported 65m interval would be perforated, but to achieve 5000 bbl/day might be unreasonable due to natural constrictive restraints within the production string and surface equipment at the wellhead......assuming the formation is normally pressured. 65m speaks to a larger volume reservoir and by the nature of it's volume then production should (likely would) show higher production rates than 1200 bbl/day