100 ft = 30.48m step out on each hole IMO this is like what GQC is doing with 25m step out holes.
From the news release:
A total of six holes were drilled in this summer's drilling campaign, each targeted to intersect the heart of the mineralized zone roughly 100 feet distant from the other. Results from these holes will be announced as they are received and are expected to be released on a one-a-week basis going forward