bad news good news: there are 6 new holes drilling away with csmat support.
good news: All three holes in lab are large stepouts; 08, 09, and RRFZ re-entry. 08 is the closest in but at 55 deg. ( a miracle to reach TD at that angle! ) it should say a lot extending this ore body due south. Any one of these would crack GSV wide open.
little news; 07 and 04 similarities are not coincidental. they are offsets
no news: we all knew 12-03 was lost
sad news: 06 could have said a lot about 10-08 extension
bad news: Continuing lack of specifics: Where are the new locations?? Where are the old (downhole) locations for that matter? Cost of loosing holes is mounting. What engineering is getting applied to this? Any eta's available on anything? I imagine this is all immaterial?
All this would be simple to include in the old website but it could be literately presented in any number of new website platforms !