DRILL HOLESBruner RC Drilling-June/July 2012
Results from RC drill holes B-1202 through B-1206 follow:
Hole |
Interval(ft) |
Width(ft) |
Au(opt) |
Au(gpt) |
B-1202 |
120-140 |
20 |
0.037 |
1.26 |
|
275-290 |
15 |
0.033 |
1.03 |
|
335-390 |
55 |
0.015 |
0.51 |
|
490-570 |
80 |
0.017 |
0.59 |
B-1203 |
285-315 |
30 |
0.014 |
0.48 |
|
360-400 |
40 |
0.019 |
0.66 |
|
550-615 |
65 |
0.016 |
0.54 |
B-1204 |
320-430 |
110 |
0.027 |
0.94 |
|
465-480 |
15 |
0.015 |
0.53 |
|
585-640 |
55 |
0.012 |
0.40 |
B-1205 |
365-375 |
10 |
0.016 |
0.53 |
|
440-455 |
15 |
0.010 |
0.35 |
|
590-605 |
15 |
0.015 |
0.52 |
B-1206 |
620-835 |
215 |
0.010 |
0.36 |
Including |
620-660 |
40 |
0.032 |
1.10 |
The geologic and assay sections of all drill holes from the June/July 2012 drilling program are posted to the website at www.canamex.us, along with a 3D model of the mineralization intersected and the target remaining to be tested.