Santa Fe road construction started with vein disco Vein discovery at Santa Fe
Santa Fe Project
Construction has commenced on the road to the Mina Grande zone in the area of Santa Fe. Through July 31, 2012 the road had advanced 2.9km and headed into the zone of interest. A total of 80 samples were taken from the site with average grades of 2 g/t Au and 270 g/t Ag. The goal is to access to 10,000 tons approximately of mineralized material with average grades of 1.54 g/t Au and 220 g/t Ag. Also, to start detail exploration works and development work in the already known veins.
During the road construction, two new veins were located and the sampling showed average grades of up to 4.0 g/t Au and 130 g/t Ag over a width of 1m.