RE: RE: RE: Ba Da BING Ba Da BOOM!! watch22 yup your numbers right :) Adding to that they can dual string each well and each string can possibly connect 2 zones , so up to 4 sands (zones) can be producing on a vertical well.
Looking at UMU 9 , THE upper zones had 11 sands (net oil pay of 260 ft) yet they only tested 5 sands for a total of 11,718 bod...so those other 6 zones have not been tested yet.
Now in the lower zones (same ones we are going to test in UMU 10) THERE was a net pay of 170 ft oil in 8 sands , yet we might only test 5 or 6 zones again out of the 8 .
In a sense i am saying if u could test every single zone in UMU 9 , IT would total much higher than 11,718 bod..if u could test all 19 zones it probably go well beyond 20,000 bod ..maybe as high as 23,000 bod depending on how good the deep zones show up in UMU 10..AND speculatively they believe there is more oil below the 8th sand (gas comdensate) It might be capping another reservoir but its so deep the pressures require a 15,000 # blow preventer an extra 50 in height beyond our drill rig.
MM