TSXV:PEC.H - Post by User
Comment by
ANBCAon Oct 25, 2012 11:58am
461 Views
Post# 20523240
RE: Results
RE: Results Hard to estimate as they've stated a liner is being installed. This may keep water etc. from contaminating the lower reaches of the well. But depending on how far the liner extends in the well may also mean having to go back and perforate it at the pay intervals. This will require them to study the drilling logs etc to determine where to perforate. The process could take some time.
This is just my view of the previous NR.
GLTA