RE: RE: Permit Withdrawal
RE: RE: Permit Withdrawal There was originally to be two wells, one vertical(2013) and one horizontal(2014). The horizontal well application was sent to an Environmental Review which, I'm told, could have taken anywhere from 8 ths to two years - either way, it couldn't be drilled in 2014 even if the process resulted in a permit ( which was far from certain)