Excellon RE: EXN announces Drill Campaign at DeSantis Gold Mine
Project, Timmins Ontario, Canada,
DeSantis Gold Mine Project, Timmins, Ontario;
Porcupine Gold Camp -
Overview & Operating Highlights -
New exploration success at North America’s Dome Mine longest continually operating gold mine.
The Porcupine Gold Camp is located in Timmins, Ontario,
one of the world's great gold producing camps.
In 2010, Porcupine marked its 100th year of continuous mine and mill operations and
has produced more than 70 million ounces of gold since production began.
Hollinger Mine (19M/oz) and Dome Mine (17M/oz to date)
• Close to Goldcorp Hollinger super pit expansion
* Porcupine Mining Camp of Golden Horse Shoe below
* Hudson Bay, Ontario -
* were about Au 200 million ounces been produced
Excellon’s DeSantis Gold Mine Project
is located along the Destor-Porcupine Tectonic Zone (“DPZ”), the main structure controlling
gold deposits in the Timmins gold camp, appr. 5 km southwest of downtown
Timmins, 11 km west of the Dome Mine currently owned and operated by Goldcorp Inc. and
14 km east of Lake Shore Gold Corp.’s Timmins Mine.
The DeSantis Gold Mine property covers approximately 5 km of strike length within highly prospective volcanic
stratigraphy on the north side of the DPZ, including the past producing DeSantis Mine.
Gold deposits in the Timmins gold camp occur in a variety of forms, but virtually all can be related to
structural controls associated with major deformation zones, the foremost being
the Destor-Porcupine Tectonic Zone, thus are mesothermal gold deposits, exhibiting the form of
‘shear-zone hosted gold deposits.’ Such gold deposits are typified by wide alteration envelopes
hosted within volcanic sequences with a locus of deformation and alteration in discrete zones which
also host significant veining including quartz and accessory minerals and gold.
The DeSantis Property hosts at least five known gold-bearing zones, including the Contact Zone,
Hydrothermal Zone, Albitite Zone, Arsenopyrite Zone, and East Pit area, all of which are located near
the area of historic underground mining on the property.
The DeSantis Gold Mine produced 35,800 ounces of gold from 178,650 tonnes of ore which
graded 6.2 g/t gold during its intermittent production history.
Production was carried out from nine levels sourcing principally the Albitite and Hydrothermal Alteration
Zones, accessed via the 379 m-deep DeSantis No. 2 Shaft.
Neighbors on both side of our former;
DeSantis Gold Mines
producer & large gold mine project PR that they have -
Gold 30 Million ounces mine potential -
30 million oz Gold Potential
https://www.youtube.com/watch?v=ohqLNvGeMJ0
https://explorresources.com/_resources/projects/Timarea_Model_Splay_Fault_Corridor_Oct_15_2010.pdf
Moneta Porcupine Mines Inc (TSE:ME) Gold 30M oz. + ? -
Read more at https://www.stockhouse.com/bullboards/messagedetail.aspx?p=0&m=31735386&l=0&r=0&s=ME&t=LIST#iWZYqvfMgU3ulKmM.99
https://www.porcupinegoldmines.ca/en/hollingeranimation.asp
https://www.monetaporcupine.com/i/pdf/MONETA_OCTOBER_2012_POST_RESOURCE2.pdf
https://www.metalscreek.com/upload/documents/timmins_deposits_everything_sm.pdf
Excellon announces Drill Campaign at DeSantis Project, Timmins
Download PDF
October 31, 2012
https://www.excellonresources.com/Investors/Press-Releases.aspx?CnwID=135041
Toronto Stock Exchange - EXN
TORONTO, Oct. 31, 2012 /CNW/ -
Excellon Resources Inc.
(TSX: EXN) ("Excellon" or "the Company") is pleased to announce
that it has commenced a 5,000 metres ("m") diamond drilling
program on its DeSantis Project in Timmins, Ontario.
Highlights from previous drilling on the project include:
Hydrothermal Zone:
7.90 g/t gold over 5.2 m in hole DS10-02;
3.40 g/t gold over 9.9 m, including 13.70 g/t Au over 0.7 m in hole DS10-06;
3.63 g/t gold over 23.17 m, including 14.25 g/t gold over 1.17 m in hole DS10-10A;
Albitite Zone:
1.74 g/t gold over 12.0 m, including 10.39 g/t Au over 1.5 m in hole DS12-004.
"We are very pleased with our technical progress at DeSantis since
the completion of the last drilling campaign in April.
The exploration team in Timmins has done a thorough job of
compiling historical data and come up with several new target
areas,"stated John Sullivan, Vice-President of Exploration.
"This regional approach has enabled the Company to see the project
in a new light and we look forward to the results of this
drilling program."
The DeSantis Project, which includes the past producing
DeSantis Gold Mine,
covers approximately five km of strike length within the highly
prospective geology of the Destor-Porcupine Deformation Zone
("DPDZ"), the main structure controlling gold deposits in the
Timmins gold camp.
The DeSantis Gold Mine
produced 35,800 ounces of gold from
178,650 tonnes of ore which
graded 6.2 g/t Au during its intermittent
production history.
The property is located approximately 11 km west of
Goldcorp Inc.'s Dome Mine and 14 km east of
Lake Shore Gold Corp.'s Timmins Mine.
Exploration on the DeSantis Project since 2010 includes
5,888 m in 15 holes in 2010 and 27 holes (seven abandoned due to
technical issues) totalling 11,039 m in 2011/2012.
In mid-October the Company completed a comprehensive program of
geotechnical compilation, relogging and sampling of recent and
historic drill core and reviewing the project in a regional
context.
Based on the results of this work the Company commenced the
current 5,000 m diamond drilling program in late October.
Drilling will follow up on promising recent results and will test
undrilled areas east of and below the known Albitite Zone.
In addition, geophysical and geological targets will be tested in
a series of holes on areas of the project that have not been
thoroughly explored.
Map 1 shows the location of the property in the Timmins Camp,
while Map 2 is a longitudinal section showing the location of
recent and planned drilling near the No. 2 shaft on both the
Hydrothermal Alteration and Albitite zones.
Beschefer Drill Campaign
A winter 2013 drill program is being planned for the Company's
100%-owned Beschefer property, which is located approximately
60 km northeast of the Casa Berardi Mine,
80 km east-southeast of the Detour Gold Project and
12 km east of the past-producing Selbaie Mine.
The property hosts the "B-14 Zone", which was discovered by
Billiton Canada Inc. in 1995, but marginally explored prior to
the Company's involvement.
In early 2012, the Company completed 8,867 m of drilling in
33 holes focussed on the B-14 Zone.
Significant intersections included
13.07 g/t Au over 8.75 m including
58.5 g/t Au over 1.50 m in hole BE12-014, and
10.35 g/t Au over 1.50 m and
3.56 g/t Au over 6.06 m in hole
BE12-030.
The B-14 Zone is found within a typical Archean volcanic
assemblage, with gold hosted in pyritic quartz veining within a
mylonitic unit.
As the Beschefer property has little or no bedrock exposure and is
muskeg-covered, drilling is most effectively performed during
freezing conditions.
Update on La Platosa Production
Excellon is also pleased to announce that milling recommenced
at the Company's mill in Miguel Auza, Zacatecas on October 29th.
In the past few days, the Company trucked 1,800 tonnes of ore
from its high-grade silver/lead/zinc
La Platosa Mine in Durango, Mexico.
An updated production forecast for the remainder of 2012 will be
released in due course.
Qualified Persons
The Company's DeSantis Project and Beschefer Property exploration
programs are supervised by John Sullivan, B.Sc., PGeo.,
Excellon's Vice-President of Exploration and Stephen Conquer,
B.Sc., PGeo., Excellon's Exploration Manager, Canada.
Mr. Sullivan is an economic geologist with over 35 years of
experience in the mineral industry.
Prior to joining Excellon in 2007 he was a senior geologist at a
Toronto-based international geological and mining engineering
consulting firm where he evaluated properties and prepared
NI 43-101 reports on gold and base metal projects
in Canada and internationally.
In addition he has held senior positions with two large Canadian
mining companies where he directed major exploration programs,
managed field offices, and evaluated projects in Canada, Europe,
Africa and Latin America.
Mr. Sullivan is not independent of Excellon as he is an officer
of the Company.
Mr. Conquer is an economic geologist with over 30 years of
experience in the mineral industry.
Prior to joining Excellon he was Senior Project Geologist and
Chief Mine Geologist for a company with gold exploration and
mining operations in Timmins where he directed surface and
underground exploration programs and the geological component of
underground mining operations.
Previously Mr. Conquer also held Chief Mine Geologist positions at
operations near Sudbury and Marathon and senior exploration
positions in the Abitibi and Red Lake Greenstone Belts.
About Excellon
Excellon's high-grade silver production drives transformative
exploration potential.
The Company's 100%-owned La Platosa Mine in Durango is Mexico's
highest grade silver mine, with lead and zinc by-products making
it one of the lowest cash cost silver mines in the country.
With 41,000 hectares of exploration ground surrounding the mine,
Excellon is focused on discovering the large-tonnage Source of
the high-grade silver mantos currently in production.
Such a discovery has the potential to transform
La Platosa into the next major project in
Mexico's prolific CRD/silver belt.
On behalf of
EXCELLON RESOURCES INC.
Peter A. Crossgrove
Executive Chairman
Read more at https://www.excellonresources.com/Projects/DeSantis.aspx