NI 43-101 Filing in 45 days, by January 7th, as per November news release?
"Considering the positive results of the resource estimates and the fact that most of the gold mineralization is covered by a thin layer of overburden, generally 0 to 5-metres thick, the Company has authorized the consultant to proceed with a Whittle-optimized pit shell simulation using a lower cut-off grade for the near surface gold zones. These results will be included in the full NI 43-101 technical report that will be filed on SEDAR within 45 days.