Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Voltalia Ord Shs VLTAF

Voltalia SA is a France-based holding company engaged in the renewable utilities sector. It designs, develops and operates electric power stations in numerous countries, such as France, French Guyana, Brazil, Greece and Morocco. The Company generates electricity using a variety of renewable energy sources. These include wind, water, biomass and solar power. In addition, Voltalia SA specializes in carbon credit trading activities. The Company operates several subsidiaries, including Anelia and Bio-Bar in France, Voltalia Guyane, SIG Kourou, SIG Mana and SIG Cacao in French Guyana, Voltalia Energia do Brasil in Brazil, Thegero in Greece and Alterrya Maroc in Morocco, among others. The Company is owned by Voltalia Investissement SA.


PINL:VLTAF - Post by User

Post by Bpultraon Jan 10, 2013 9:47am
182 Views
Post# 20819548

nr

nr

 

Higher Grade Lenses Support Phased Development and Selective Mining Approach at Volta Resources' Kiaka Gold Project
Canada NewsWire
 
 

- Feasibility Study to be based on phased development / selective mining approach -

- Global Measured & Indicated resources increase by 10% to 4,862,000 ounces gold -

Photo_Asset_1

TSX: VTR

TORONTO, Jan. 10, 2013/CNW/ - Volta Resources Inc. ("Volta Resources" or the "Company") (TSX: VTR) announces an updated NI 43-101 compliant Mineral Resource estimate for the Kiaka Gold Project, located approximately 140km southeast of Ouagadougouin southern Burkina Faso.  The updated Mineral Resource estimate has been undertaken by independent SRK Consulting (UK) Limited from Cardiff, with input from Volta's geological team.  The update follows completion of an additional 233 holes (38,602m) drilled in Phase 4 at the Kiaka Central Area.  Including the Randgold drilling (18 holes) and Volta's drilling phases 1 to 3, the total amount of drilling used for the resource estimates at the Kiaka Central and Kiaka South resource areas now stands at 1,623 holes (237,971m).

Highlights:

  • Confirmation of the continuity of higher grade lenses within the Kiaka Main Zone (KMZ), facilitating the definition of discrete lenses (KMZ_Lenses) hosting Measured and Indicated Resources of 41.68 Mt @ 1.52 g/t Au for 2,039,000 ounces of gold and Inferred Resources of 5.51 Mt @ 1.70 g/t Au for 301,000 ounces of gold.

    • Surrounding the KMZ_Lenses, the KMZ_Halo hosts additional Measured and Indicated Resources of 83.75 Mt @ 0.77g/t Au for 2,072,000 ounces of gold and Inferred Resources of 9.87 Mt @ 0.73 g/t Au for 231,000 ounces of gold.

      • Adjacent to the KMZ_Lenses and KMZ_Halo, the Kiaka Footwall Zone (KFZ), the Kiaka Hangingwall Zone (KHZ) and the Kiaka Upper Block (KUB) (collectively referred to as the Adjacent Zones) add a further 26.00 Mt @ 0.76 g/t Au for 633,000 ounces of gold in the Measured and Indicated categories and 18.28 Mt @ 0.80 g/t Au for 469,000 ounces of gold in the Inferred category.

        • The total Kiaka Project, including Kiaka Central and Kiaka South, now contains Measured and Indicated Resources of 153.26 Mt @ 0.99 g/t Au for 4,862,000 ounces of gold and Inferred Resources of 33.74 Mt @ 0.93g/t for 1,006,000 ounces of gold (unchanged). This represents a 10% increase in Measured and Indicated Resources, when comparing both sets of models at a 0.4g/t cut-off.

          • The total Kiaka Project has higher grade Measured and Indicated Resources of 29.56 Mt @ 1.51g/t for 1,437,000 ounces of gold occurring within the top 250m of the deposits, sufficient to sustain processing ore at an in situ grade approximately 40% higher than the average grade of the deposits in a 6.0 Mt per annum facility for up to five years.

          Kevin Bullock, Volta's President and CEO, commented, "The primary objective of the work leading to this latest Mineral Resource update for the Kiaka Gold Project has been met.  We can now confidently define discrete and continuous higher grade KMZ_Lenses within the broader lower grade KMZ envelope in the Kiaka Central Area. This supports and clearly illustrates that it would be practical to selectively mine and process sufficient tonnes of ore at an in situ grade approximately 40% higher than the average grade of the deposit for up to five years, while stockpiling the lower grade ore, thereby supporting a phased development approach for the Kiaka Project.  This would entail installing initial processing capacity of 6.0 Mt per annum (significantly lowering CAPEX) for up to five years and scaling up to 12.0 Mt per annum for the remainder of the mine life.  The phased development scheme will now be implemented in the current Feasibility Study being carried out for the project."

          Mr. Bullockalso noted, "We are delighted that the Mineral Resource on the Kiaka project has once again increased.  Significantly, the Measured and Indicated Resources now stand at 4.86 Moz of gold, representing a 10% increase, while the Inferred Resources remain unchanged at 1.0 Moz of gold.  The Kiaka Gold Project now hosts the largest undeveloped gold deposit in {C}Burkina Faso{C} and one of the largest undeveloped gold deposits in the West African region."

          The updated Mineral Resource Statement for the Kiaka Gold Project is presented in Table 1.

          Table 1: SRK Kiaka Mineral Resource Estimate Statement Split by Deposit and Zone

          as of 8th January 2013at a 0.4 g/t Au cut-off

          Deposit/Zone Category Tonnes (kt) Gold (g/t) Metal Gold (Koz)
          Kiaka Central

          KMZ_Lenses
          Measured 12,664 1.58 643
          Indicated 29,015 1.50 1,396
          Measured & Indicated 41,679 1.52 2,039
          Inferred 5,510 1.70 301
                   
          Kiaka Central

          KMZ_Halo
          Measured 21,047 0.79 533
          Indicated 62,698 0.76 1,539
          Measured & Indicated 83,745 0.77 2,072
          Inferred 9,872 0.73 231
                   
          Kiaka Central 

          Adjacent Zones

           
          Measured      
          Indicated 25,995 0.76 633
          Measured & Indicated 25,995 0.76 633
          Inferred 18,280 0.80 469
                   
          Kiaka South Measured      
          Indicated 1,840 2.00 118
          Measured & Indicated 1,840 2.00 118
          Inferred 75 1.90 5
                   
          TOTAL Kiaka Project Measured 33,711 1.09 1,176
          Indicated 119,548 0.96 3,686
          Measured & Indicated 153,259 0.99 4,862
          Inferred 33,737 0.93 1,006

          Notes:

          1. Mineral Resources have been prepared under the CIM guidelines for reporting of Mineral Resources and Mineral Reserves.
            • This Mineral Resource estimate is based on a cut-off grade of 0.4 Au (g/t) within mineralized wireframes, within a conceptual Whittle pit shell based on a gold price of US$1,400 per ounce, marginal operating costs of US$11.89 per tonne for processing and G&A and US$1.58 per tonne for mining (assuming a 12Mtpa CIP operation - as per Pre-feasibility study) and assuming a process recovery of 89.8%.
              • In the Kiaka Central Area "KMZ_Lenses" and "KMZ_Halo" represent the high and low grade domains within the KMZ respectively, whilst the "Adjacent Zones" represents KHZ, KFZ and KUB (Kiaka Upper Block) mineralization.
                • The Kiaka South Area deposit included in the overall Kiaka Project resource estimate is located less than 700m south of the Kiaka Central Area and the Mineral Resource estimate, restated here, was undertaken and reported in September 2012.
                  • SRK used a block model with block dimensions of 5 x 20 x 10m into which gold grades have been estimated based on optimised ordinary kriging routines with a search ellipse orientated to follow the strike of each domain.
                    • Mineral Resources have been classified such that Measured Resources have been defined to areas of infill drilling of better than 25m x 25m, Indicated Resources to 50m x 50m and Inferred Resources to blocks lying outside of Indicated wireframes which still display reasonable strike continuity and dip extension.
                      • All figures are rounded to reflect the relative accuracy of the estimate. All composites have been capped where appropriate.
                        • Mineral Resources are not Mineral Reserves and do not necessarily demonstrate economic viability.  
                          • The RC and cored samples were collected at 1m intervals. Dry RC samples were riffle-split to provide 2 kg samples sent to the laboratory. Wet samples were dried in the field, then riffle-split in the same way. The cored portion of the drill holes were sampled at one meter intervals and cut in half using a diamond saw. Half-core is archived at the core storage facility on site while the other half sent to the laboratory.
                            • Samples associated with this Mineral Resource update were assayed at the ALS Chemex laboratory in Ouagadougou, Burkina Faso. The ALS Minerals quality system complies with the requirements of the international standards ISO 9001:2000 and ISO 17025:2005 and operates in all their laboratory sites.  Samples were assayed for gold (fire assay with AAS finish), using the ALS protocol with laboratory code "Au_AA26".
                              • Volta's QAQC procedures include the insertion of certified standards every 15 samples, field duplicates (in the RC portions) about every 25 and blanks about every 10 samples.  SRK has analysed the data generated by the QAQC procedures  and deems the data to be acceptable for use in the estimation of Mineral Resource Estimates, to be reported in compliance with CIM "Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines" (CIM Standards). 

          .

          The KMZ comprises a 100m to 260m wide orebody, extending for over 1,500m along strike and over 500m down dip.  The KMZ is readily defined within a 0.3 g/t Au mineralized envelope, corresponding to deformed, altered and north-easterly trending corridor of Birimian meta-sedimentary and meta-volcanic lithologies.

          Although it was recognized early on by Volta and SRK that there were higher grade lenses of mineralization within a broad halo of lower grade mineralization within the KMZ, previous resource estimates were based on grade interpolation within the overall broad mineralized envelope.  In order to highlight the potential of the higher grade zones, previous resource estimates presented a global breakdown of the KMZ mineral resource as "Mineralized Bands" (>1.0 g/t Au) and "Halo Mineralization" (between 0.6 g/t Au and 1.0 g/t Au).

          Additional infill drilling, re-logging , interpretation and modelling of the drilling undertaken since the last Mineral Resource estimate in the Kiaka Central Area has now successfully confirmed the presence of discrete higher grade lenses (KMZ_Lenses) ranging between 5m and 50m wide.  These extend with good continuity for 100m to 800m along strike and 50m to 400m down dip. They are surrounded by lower grade mineralization (KMZ_Halo), within the broad KMZ orebody.

          The confidence in the current interpretation and model for discrete and continuous KMZ_Lenses surrounded by KMZ_Halo is supported by:

          • The KMZ_Lenses are visually recognized in drill core as being associated with a retrograde metamorphic event (appearance of a secondary biotite and garnet replacement by chlorite) associated with more intense deformation, overprinting the prograde metamorphic signature that characterises the KMZ_Halo mineralization.

            • The KMZ_Lenses can be traced from hole to hole and section to section so that SRK were able to delineate hard boundaries to constrain them for modelling.  This has resulted in a marked improvement in geostatistical domaining, thereby significantly reducing the nugget effect, increasing range in the variograms and overall confidence in the resource estimate.

            The nature, scale and continuity of the KMZ_Lenses are such that they would be amenable to selective mining for priority processing, while the KMZ_Halo would be stockpiled for processing later.  Overall, there are 29.56 Mt @ 1.51g/t Au for 1,437,000 ounces of gold of higher grade material occurring within the top 250m of the deposits.  This could be sufficient to sustain processing ore at an in situ grade approximately 40% higher than the average grade of the deposits utilizing a 6 Mtper annum facility for 5 years.

            This is illustrated in the graph below, where block model Measured and Indicated Resource tonnage and grade estimates within the conceptual Kiaka Central and Kiaka South resource pits are shown in 50m incremental elevations below surface for the Kiaka Project.

            The previous Mineral Resource, reported on 20th March 2012, for Kiaka Central was based on a 0.6g/t cut-off grade.  The Kiaka Prefeasibility Study completed in 2012 utilized a 0.4g/t cut-off grade to define Mineral Reserves for Kiaka Central.  Consequently, the current Mineral Resource estimate utilizes a 0.4g/t cut-off grade for Kiaka Central.  The previous Mineral Resource for Kiaka South used a 0.4g/t cut-off, so this is unchanged.  Therefore, comparing like with like at Kiaka Central, there has been an increase in tonnage (+13%), a decrease in grade (-3%) and an overall increase in ounces (+10%) in the Measured and Indicated Resources at the 0.4g/t cut-off grade.

            Table 2 shows the Measured and Indicated and Inferred Resources at incremental cut-off grades from 0.2 g/t Au to 1.4 g/t Au, within the updated geological block model for the Kiaka Central Area.

            Table 2: Grade Tonnage Sensitivity Analysis and Comparison for Kiaka Central Area

            Between 20 March 2012and 8 January 2013Models

              Current Mineral Resource Estimate

            (8 January 2013)
              Previous Mineral Resource Estimate

            (20 March 2012)
              Measured & Indicated Inferred   Measured & Indicated Inferred
              Tonnes Au Metal Tonnes Au Metal   Tonnes Au Metal Tonnes Au Metal
            Cut-off Kt g/t (Koz) Kt g/t (Koz)   Kt g/t (Koz) Kt g/t (Koz)
            1.40 24,750 1.84 1,462 4,390 2.00 284   17,780 1.78 1,020 4,200 1.80 200
            1.20 37,930 1.65 2,012 6,540 1.80 374   32,170 1.56 1,610 7,200 1.60 370
            1.00 53,990 1.49 2,578 10,010 1.50 496   55,970 1.36 2,450 13,100 1.40 570
            0.80 80,030 1.29 3,325 15,090 1.30 642   86,360 1.20 3,330 21,300 1.20 810
            0.70 98,770 1.19 3,776 19,330 1.20 744   102,380 1.13 3,710 25,700 1.10 910
            0.60 120,570 1.09 4,230 24,250 1.10 846   117,420 1.07 4,030 30,000 1.00 1,000
            0.50 139,960 1.02 4,575 30,060 1.00 949   128,250 1.02 4,220 33,400 1.00 1,070
            0.40 151,420 0.97 4,744 33,660 0.90 1,002   134,220 1.00 4,310 35,500 1.00 1,100
            0.20 156,610 0.95 4,801 35,470 0.90 1,022   137,480 0.98 4,350 37,300 0.90 1,120

             

            The main focus for the Kiaka Project is now to complete the final Feasibility Study before the end of Q3 2013.  The study will be based on a phased development scenario, whereby significantly higher grade ore will be selectively processed (with lower grade ore stockpiled) in a 6.0 Mt per annum plant for five years, scaling up to process 12.0 Mt per annum for the remainder of the Life of Mine.  This will considerably reduce initial CAPEX and reduce payback periods.

            Additional metallurgical test work including more comminution studies and variability analyses is currently underway.  Geotechnical and hydrological studies are well advanced with drilling dedicated to these aspects almost complete.  Waste rock characterization studies, including test work for acid rock drainage and metal leaching (ARDML), are underway.  Civil geotechnical studies to assess load bearing characteristics for heavy infrastructure and substrate conditions for tailings and rock waste storage sites is almost complete.  Baseline studies and an Environmental and Social Impact Assessment undertaken to meet IFC Performance Standards are also close to completion.

            Exploration on the Kiaka permit will now focus on testing some of the other regional targets identified by Randgold and Volta in this highly prospective area.

            A copy of the full technical report that accompanies the NI 43-101 resource statement will shortly be posted on the Volta Resources website and on SEDAR.

            Pursuant to National Instrument 43-101, the qualified person responsible for the technical data provided in this press release is Mr. Ben Parsons, a Senior Consultant (Resource Geology), and a full time employee of SRK Consulting (UK) Ltd. Mr. Parsonsis a member of the AusIMM with Chartered Professional status. Mr Parsons has reviewed and approved the contents of this news release.

            About Volta Resources:

 

<< Previous
Bullboard Posts
Next >>