Santa Fe (new) contributes 18% mill feed This was historical ore previously produced at the site lying there after they built the roads. Note this was to Oct 31
The total volume of production at the mine during Q2 (September 1, through October 31, 2012) was 18,741 tonnes grading 1.25 g/t Au and 216.86 g/t Ag. 51% of volume was produced from Tajos Cuates, 19% from Santa Fe Project, 18% from Florida and the remaining 12% from the San Francisco Project.
At Santa Fe the Company has initiated a program to process mineralized material from historical dumps. The Company’s tests have shown that the grade of this material warrants processing through the mill.