Have a look at this This is what I am talking about. A fully funded 50,000 meter drilling program:
2013 Drill Program: 50,000m within sedimentary mineralized structural corridor
2013 Drill Program: 50,000 metres
Infill drilling
•upgrade inferred to indicated ounces
•increase drill data density / reduce strip ratio
Step out drilling to expand current NI 43-101 pit footprint
•test for sub-parallel zones
•test for high grade mineralized chutes
Board of directors and management team
Add additional technical depth
Work towards Memorandum of Understanding with First Nations
Advance environmental baseline studies - ongoing since 2011
Please take a look at the entire presentation. Thanks to Goldcross for posting the original document:
https://www.monetaporcupine.com/i/pdf/MONETA_JANUARY_2013.pdf
Looks like mr. Peres and Mr Aubertin are going to be busy this next while!
Comments
Kapboy